They got a crane and lifted all the lumber up to the second floor. So the only lumber left on the ground are the two big beams that will go up when the second floor is finished.
On another note we had holes drilled for the piles for the garage floor, the front sidewalk and steps and the back patio. Unfortunately with so much rain some of them have caved in and we are going to have to re-drill them and then get them filled with cement as soon as possible.